Half storey freehold corner factory in jalan Haji Sirat. 4300 sq ft
The regional flood mitigation projects affecting Jalan Haji Sirat are already underway, progressing in several implementation phases. Because this road corridor is linked to a wider network of rivers and drains connecting Kapar, Meru, and Bandar Bukit Raja, the programme is being delivered through a mix of short-term emergency works and longer-term federal initiatives:
Project Timeline & Start Dates
• Urgent Drainage Upgrades (Started Mid-2025): The Selangor State Government and the Klang Royal City Council (MBDK) rolled out 17 high-priority drainage projects across 13 key Klang hotspots (including nearby Meru and Kapar). On-the-ground works such as drain widening and culvert replacements began immediately to ease local flooding impacts.
• Long-Term Regional Mitigation (Ongoing through 2030): The broader infrastructure plan, including the RM144 million MBDK Flood Mitigation Action Plan (KLASS 2025–2030), together with federal structural projects for the Sungai Kapar network, is being implemented step-by-step over a multi-year horizon.
• Bukit Raja Drainage Upgrades (Under Review/Design Phase): As of October 2026, the Selangor state government, working with relevant federal agencies, is finalizing technical assessments and expanding budgets (including the RM40 million allocation for the Bukit Raja network) to introduce new retention ponds and drainage routes feeding out of the Jalan Haji Sirat corridor.
Project Timeline & Start Dates
• Urgent Drainage Upgrades (Started Mid-2025): The Selangor State Government and the Klang Royal City Council (MBDK) rolled out 17 high-priority drainage projects across 13 key Klang hotspots (including nearby Meru and Kapar). On-the-ground works such as drain widening and culvert replacements began immediately to ease local flooding impacts.
• Long-Term Regional Mitigation (Ongoing through 2030): The broader infrastructure plan, including the RM144 million MBDK Flood Mitigation Action Plan (KLASS 2025–2030), together with federal structural projects for the Sungai Kapar network, is being implemented step-by-step over a multi-year horizon.
• Bukit Raja Drainage Upgrades (Under Review/Design Phase): As of October 2026, the Selangor state government, working with relevant federal agencies, is finalizing technical assessments and expanding budgets (including the RM40 million allocation for the Bukit Raja network) to introduce new retention ponds and drainage routes feeding out of the Jalan Haji Sirat corridor.
Anggaran Pinjaman Gadai Janji
Perincian Pinjaman Gadai Janji
Anggaran Bayaran Balik Bulanan
RM 0 / bulanan
RM 0 Prinsipal
RM 0 Faedah
Kos Pendahuluan
Jumlah Bayaran Pendahuluan
RM 0
Bayaran Pendahuluan
RM 0 Jumlah Pinjaman dari 0% nilai pinjaman
Soalan Lazim
Seunit di Klang, Selangor dijual pada harga RM 1,555,000.
Tidak.
off jalan haji sirat, Klang, Selangor.
Anggaran bayaran bulanan pinjaman ialah RM 6,681 / bulanan.
Terokai Pilihan Lain Di Dalam Dan Sekitar Klang
Berdasarkan kriteria hartanah, anda mungkin berminat dengan yang berikut
Kilang Teres untuk Dijual