Harvest Green Industrial Park

Jalan Pasir Putih, Taman Pasir Putih, Pasir Gudang, Johor

RM 92,000 /bulan


BM

4

BM

kps (lantai)

36,711

kps (lantai)


loading-bay-o

Boleh didapati daripada 1 Jan 2026

Butiran hartanah

home-open-o
Kilang untuk disewa
renovated-o
Unit kosong
document-with-lines-o
Disiapkan pada 2017
calendar-time-o
Disenaraikan pada 5 Nov 2025
document-with-lines-o
ID penyenaraian - 500330874
ruler-o
36,711 kps luas pelan lantai

Tentang hartanah ini

Pasir Gudang 37000sqft factory for rent/sales

BRAND NEW DETACHED FACTORY / WAREHOUSE @ PASIR GUDANG FOR RENT OR SALE

Pasir Putih @ Pasir Gudang
Total Land Size Approx 1.32 Acres
Total Bua Approx 36,711 Sqft
- Light Industry
- Detached Factory
- Power Supply 400amp
- Free Hold Non Bumi
- With G&G
- Ceiling Height 12 meter

Rent - Rm 2.50 Psf
Selling - RM 450 psf
Kemudahan
asterisk-o

Akses 24 jam

security-access-control-o

Security guard

Kemudahan bersama
parking-o

Parkir

Harvest Green Industrial Park

Project Image

Harvest Green Industrial Park is an innovative and secure industrial park located within the Sime Darby Business Park in Pasir Gudang, Johor. Developed by Harvest Land Development Sdn Bhd on 23.6 acres of freehold land, this development is designed for modern industrial needs, focusing on logistics, manufacturing, and business operations. It is the only gated and guarded freehold industrial park in Pasir Gudang, offering a secure environment with 24-hour CCTV monitoring. Perfectly positioned within Iskandar Malaysia's Flagship D (Eastern Gate Development), Harvest Green offers exceptional connectivity for businesses. The park provides direct access to four major highways: the Pasir Gudang Highway, Senai-Desaru Highway, Coastal Highway, and North-South Highway. Its strategic location places it between two major international ports, with Johor Port and Tanjung Langsat Port accessible within a 10-minute drive. This prime location is ideal for key economic activities such as heavy industries, logistics, electronics, chemical, and food-based industries. Harvest Green Industrial Park features a comprehensive range of Ready Built Facilities (RBF) to ensure businesses can operate immediately and efficiently. The park is equipped with world-class infrastructure, including: A dependable and ample electricity supply is sourced from two separate power plants, the Sultan Iskandar Power Station and YTL Pasir Gudang Power Station. Power capacity ranges from 150 to 200 Amps with a 3-phase supply. Natural gas supply is available on-site via dedicated lines from Gas Malaysia. The park is ready with high-speed broadband to meet modern business demands. It is a fully gated and guarded environment with 24-hour security and CCTV surveillance. Harvest Green offers a variety of factory types to suit different business requirements, all featuring a contemporary design with a 9-meter factory ceiling height. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. The industrial park is surrounded by mature neighborhoods, providing a ready pool of skilled workforce. It is also located near several recreational spots and healthcare facilities, including Tanjung Puteri Golf Resort and Daiman 18 Golf Club. Harvest Green Industrial Park was developed by Harvest Land Development Sdn Bhd, as part of the larger Sime Darby Business Park.

Lihat butiran projek
Soalan Lazim
Sewa bulanan di Taman Pasir Putih, Pasir Gudang ialah RM 92,000 /bulan.
Ya (Security Guard).
Jalan Pasir Putih, Taman Pasir Putih, Pasir Gudang, Johor.
Berikut adalah panduan untuk menyewa di Malaysia termasuk deposit sekuriti dan memahami kepentingan perjanjian sewaan.
Tarikh siap adalah pada 2017.