The Maple Residences

Jalan Hujan Rintik, Taman Overseas Union (Taman Oug), Jalan Klang Lama (Old Klang Road), Kuala Lumpur

RM 4,100 /bulan


BT

3

BT

BM

3

BM

kps

1,152

kps


LRT

700 m (8 mins) from Sri Petaling

loading-bay-o

Sedia untuk Dimasuki Kondominium


photo

Gambar

video

Video

map

Paparan Peta

Butiran hartanah

home-open-o
Kondominium untuk disewa
furnished-o
Kelengkapan penuh
document-with-lines-o
Disiapkan pada Apr 2025
calendar-time-o
Disenaraikan pada 15 Okt 2026
document-with-lines-o
ID penyenaraian - 502269060
ruler-o
1,152 kps luas pelan lantai

Tentang hartanah ini

Modern Corner Unit at The Maple Residences

- Spacious 1152 sqft corner lot unit available for immediate rent at RM4,100.
- Fully furnished residence featuring a practical layout with three bedrooms and three bathrooms.
- High quality appliances included such as a fridge, washing machine, dryer, and induction cooker.
- Exclusive amenities including an infinity pool, private garden, and EV car charging station.
- Enhanced safety features provided with a smoke alarm, child safety gate, and 24-hour security.
- Prime location offering seamless connectivity to major highways including the KESAS and NPE.
- Situated within proximity to esteemed educational institutions including SJK and SMK schools.
- Enjoy a refined living experience in a freehold development designed for comfort and accessibility.
Kemudahan
asterisk-o

Almari

asterisk-o

Bidai

asterisk-o

Cermin

bed-o

Katil

Kemudahan bersama
bbq-o

Bbq

shared-space-o

Dewan serbaguna

washer-o

Dobi

gym-o

Gim

The Maple Residences

Project Image

The Maple Residences

Lihat butiran projek

Soalan Lazim

Sewa bulanan di Taman Overseas Union (Taman Oug), Jalan Klang Lama (Old Klang Road) ialah RM 4,100 /bulan.
Ya (Kawalan keselamatan 24 jam).
Jalan Hujan Rintik, Taman Overseas Union (Taman Oug), Jalan Klang Lama (Old Klang Road), Kuala Lumpur.
Berikut adalah panduan untuk menyewa di Malaysia termasuk deposit sekuriti dan memahami kepentingan perjanjian sewaan.
Tarikh siap adalah pada Apr 2025.