Ditanya oleh
For a office building ( 5 to 6 stories ) for renovating / refurbishing. Does the contractor / project manager have to meet face to face with the client (boss)? Or if the boss sends a representative (staff or others), can the representative meet with the contractors and plan out everything with them?

Or are there documents that only needs the boss (client) to approve or can everything be handled by the representative?
0
198 dilihat
Mahu soalan ini dijawab?
Dapatkan respons lebih pantas daripada pakar kami dengan mengundi naik.
Jadilah yang pertama mengundi untuk soalan ini.

1 Answer

Masih mencari jawapan?

Dapatkan nasihat daripada komuniti pakar kami

Soalan Terdahulu