5 acres Detached Factory (Tenanted ROI 6%) Telok Panglima Garang

Telok Panglima Garang, Selangor

RM 47,260,000


Baths

6

Baths

acre (land)

5

acre (land)

auto-size-o

RM 216.99

psf (land)


photo

Photos

floorplan

Floor Plans

map

Map View

Property details

home-open-o
Detached Factory for sale
renovated-o
Bare
document-with-lines-o
Completed in 2026
calendar-days-o
Freehold tenure
calendar-time-o
Listed on 13 Oct 2026
document-with-lines-o
Listing ID - 502252213

About this property

Big Freehold Detached Factory for sale with 5 acres and 1000 Amp power

【ACTUAL PHOTOS】.【ACTUAL PHOTOS】.【ACTUAL PHOTOS】.

Land Tenure : Freehold
Zoning : Industrial
Category Industrial : Medium

Land Size : 5 acres
Factory B/U : 133,000 sqft
Office B/U : 6,000 sqft ( 2 storey each floor 3,000 sqft )
Total Built-up ( Factory + office ) : 139,000 sqft

Factory Ceiling Height : 13 metre
Power : 1,000 amps ( Upgradeable )
Factory flooring Loading : piling 3 ton per sqm

Fire sprinkler system
Factory wall : Close up with 4 feet brick wall and full high metal cladding

[SET BACK]
Front set back : 100 feets
Left set back : 25 feets
Right set back : 40 feets
Back set back : 40 feets

Gas pipe ( 4 KM away )
Inner road : Concrete road with concrete piling
Factory and outside road totally no flood.

Factory front 100 feets huge space for lorry and car parking
Huge space at front, back and side area design for container to turn

== Call me for actual VIDEO ==
== Call me for more details ==
O16-3II 7797
O 1*****
0*****

Marcus Beh (REN07994)
Owner welcomes to list your property to us ...
欢迎业主直接委托
Amenities
asterisk-o

Emergency exit

asterisk-o

Fire extinguisher

Estimated mortgage
Mortgage breakdown
Est. monthly repayment
RM 0 / mo
0%
0%
RM 0 Principal
RM 0 Interest
Upfront costs
Total downpayment
RM 0
0%
0%
Downpayment
RM 0 Loan amount at 0% Loan-to-value

RM
RM
%
Yrs

FAQs

The unit for sale in Telok Panglima Garang, Selangor is RM 47,260,000.
No.
Telok Panglima Garang, Selangor.
The estimated loan repayment amount is RM 203,063 / mo.
The completion date is in 2026.