Harvest Green Industrial Park
Jalan Pasir Putih, Taman Pasir Putih, Pasir Gudang, Johor
RM 2,300,000
Negotiable4
Baths
7,441
sqft (floor)
RM 309.10
psf (floor)

Photos

Map View
About this property
Harvest Green Industrial Park 3 Storey Cluster Factory For Sale
Harvest Green Industrial Park
3 Storey Cluster Factory
3层田字工厂
Intermediate Lot
中间单位
Facing Main Road
面向大路
Location: Jalan Senangin x, Taman Pasir Putih, 81700 Pasir Gudang
Category: Light Industry
轻工业
Land Size: 9,170 sqft
Total Built-up: 7,441 sqft
Production Area: 4,580 sqft (92 x 49.8)
1st & 2nd Floor Area: 1,430 sqft
Power Supply: 150 amp
Ceiling Height: 9 m
Floor Loading: 10 kN/m²
Freehold
永久地契
International Lot
国际单位
Tenanted
带租约出售
Rental Income: RM6,000/month
Excluding Maintenance Fee
Tenancy Until: Q3 2027
R.O.I: 3.1%
Remarks:
• Original Condition
• Images for illustration purpose only
• Approx. 26 km to JB CIQ
• Approx. 33 km to Johor Port
• Accessibility to world-class facilities within 10 minutes, including Johor Port and Tanjung Langsat Port
• Direct access to four major highways
• Nearby Tanjung Puteri Golf Resort, Daiman 18 Golf Club and healthcare facilities
Selling Price: RM2.3 million nego
Common facilities
Parking
Estimated mortgage
Harvest Green Industrial Park

Harvest Green Industrial Park is an innovative and secure industrial park located within the Sime Darby Business Park in Pasir Gudang, Johor. Developed by Harvest Land Development Sdn Bhd on 23.6 acres of freehold land, this development is designed for modern industrial needs, focusing on logistics, manufacturing, and business operations. It is the only gated and guarded freehold industrial park in Pasir Gudang, offering a secure environment with 24-hour CCTV monitoring. Perfectly positioned within Iskandar Malaysia's Flagship D (Eastern Gate Development), Harvest Green offers exceptional connectivity for businesses. The park provides direct access to four major highways: the Pasir Gudang Highway, Senai-Desaru Highway, Coastal Highway, and North-South Highway. Its strategic location places it between two major international ports, with Johor Port and Tanjung Langsat Port accessible within a 10-minute drive. This prime location is ideal for key economic activities such as heavy industries, logistics, electronics, chemical, and food-based industries. Harvest Green Industrial Park features a comprehensive range of Ready Built Facilities (RBF) to ensure businesses can operate immediately and efficiently. The park is equipped with world-class infrastructure, including: A dependable and ample electricity supply is sourced from two separate power plants, the Sultan Iskandar Power Station and YTL Pasir Gudang Power Station. Power capacity ranges from 150 to 200 Amps with a 3-phase supply. Natural gas supply is available on-site via dedicated lines from Gas Malaysia. The park is ready with high-speed broadband to meet modern business demands. It is a fully gated and guarded environment with 24-hour security and CCTV surveillance. Harvest Green offers a variety of factory types to suit different business requirements, all featuring a contemporary design with a 9-meter factory ceiling height. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. The industrial park is surrounded by mature neighborhoods, providing a ready pool of skilled workforce. It is also located near several recreational spots and healthcare facilities, including Tanjung Puteri Golf Resort and Daiman 18 Golf Club. Harvest Green Industrial Park was developed by Harvest Land Development Sdn Bhd, as part of the larger Sime Darby Business Park.
View project details














