Menglembu ESG Industrial Park

Ipoh, Perak

RM 899,000


Baths

2

Baths

sqft (land)

4,050

sqft (land)

auto-size-o

RM 221.98

psf (land)


photo

Photos

map

Map View

Property details

home-open-o
Semi-D Factory for sale
renovated-o
Bare
document-with-lines-o
Completed in 2027
calendar-days-o
Leasehold (97 years left)
calendar-time-o
Listed on 27 Nov 2026
document-with-lines-o
Listing ID - 502394393

About this property

Brand New 3 Storey Semi D Factory In Menglembu Industrial Hub

Secure your business future with this brand new three-storey semi-detached factory located in the thriving TKB Industrial Park, Menglembu. Spanning a generous land area of 4,051 sqft with a 1,760 sqft built-up area, this property is designed for efficiency and modern industrial demands.

This factory features a high 30-foot ceiling height, providing excellent vertical clearance for storage or production machinery. The unit is equipped with a ground-floor 3-phase electricity supply with 100 amps, ensuring your operations have the power they need to succeed. With 15 solar panels installed, this property offers a sustainable edge that helps manage long-term energy costs.

Security is a priority, as the development is fully gated and guarded with 24-hour security and access, giving you peace of mind for your assets. The layout includes a practical 13-foot side land, providing additional flexibility for logistics or workspace extension. This is a rare opportunity to invest in a versatile and modern commercial asset in a prime location in Ipoh, Perak.
Amenities
asterisk-o

24-hour access

security-access-control-o

Security guard

Common facilities
security-access-control-o

24 hours security

Estimated mortgage
Mortgage breakdown
Est. monthly repayment
RM 0 / mo
0%
0%
RM 0 Principal
RM 0 Interest
Upfront costs
Total downpayment
RM 0
0%
0%
Downpayment
RM 0 Loan amount at 0% Loan-to-value

RM
RM
%
Yrs

FAQs

The unit for sale in Ipoh, Perak is RM 899,000.
Yes (24 hours security).
Ipoh, Perak.
The estimated loan repayment amount is RM 3,862 / mo.
The completion date is in 2027.