Harvest Green Industrial Park

Jalan Pasir Putih, Taman Pasir Putih, Pasir Gudang, Johor

RM 11,000 /mo


Baths

4

Baths

sqft (floor)

7,441

sqft (floor)


loading-bay-o

Ready to move in Factory


photo

Photos

map

Map View

Property details

home-open-o
Factory for rent
renovated-o
Bare
document-with-lines-o
Completed in 2017
calendar-time-o
Listed on 30 Mar 2026
document-with-lines-o
Listing ID - 501001012
ruler-o
7,441 sqft floor area

About this property

Pasir Gudang Cluster Factory For Rent

Pasir Gudang Cluster Factory For Rent

Location: HARVEST GREEN @ SIME DARBY BUSINESS PARK, TAMAN PASIR PUTIH, PASIR GUDANG

Property Type: Single Storey Cluster Factory With 2 Storey Office
Built Up Area From 7,441 Sqft.
Land Size 9,170 Sqft


Key Feature:
1. 150 Amps Power Supply With 3 Phase Incoming Electrical Supply
2.9 Meter Ceiling Height At Factory Area And 3
Meter Floor To Floor Height At Corporate
Showroom / Office
1. Gated And Guarded
2. RC Floor With Hardener On Production Floor
Area
1. RBF - Ready Built Facilities, Contemporary Design Concept
2. High Speed Broadband Ready
3. LED Street Lights
4. Secure Environment With CCTV

Rental : RM 11,000.00 per month

( 2 Adjoining units are available)

PLS CALL JACELYN @ 0***** FOR MORE INFORMATION
Common facilities
parking-o

Parking

Harvest Green Industrial Park

Project Image

Harvest Green Industrial Park is an innovative and secure industrial park located within the Sime Darby Business Park in Pasir Gudang, Johor. Developed by Harvest Land Development Sdn Bhd on 23.6 acres of freehold land, this development is designed for modern industrial needs, focusing on logistics, manufacturing, and business operations. It is the only gated and guarded freehold industrial park in Pasir Gudang, offering a secure environment with 24-hour CCTV monitoring. Perfectly positioned within Iskandar Malaysia's Flagship D (Eastern Gate Development), Harvest Green offers exceptional connectivity for businesses. The park provides direct access to four major highways: the Pasir Gudang Highway, Senai-Desaru Highway, Coastal Highway, and North-South Highway. Its strategic location places it between two major international ports, with Johor Port and Tanjung Langsat Port accessible within a 10-minute drive. This prime location is ideal for key economic activities such as heavy industries, logistics, electronics, chemical, and food-based industries. Harvest Green Industrial Park features a comprehensive range of Ready Built Facilities (RBF) to ensure businesses can operate immediately and efficiently. The park is equipped with world-class infrastructure, including: A dependable and ample electricity supply is sourced from two separate power plants, the Sultan Iskandar Power Station and YTL Pasir Gudang Power Station. Power capacity ranges from 150 to 200 Amps with a 3-phase supply. Natural gas supply is available on-site via dedicated lines from Gas Malaysia. The park is ready with high-speed broadband to meet modern business demands. It is a fully gated and guarded environment with 24-hour security and CCTV surveillance. Harvest Green offers a variety of factory types to suit different business requirements, all featuring a contemporary design with a 9-meter factory ceiling height. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. The industrial park is surrounded by mature neighborhoods, providing a ready pool of skilled workforce. It is also located near several recreational spots and healthcare facilities, including Tanjung Puteri Golf Resort and Daiman 18 Golf Club. Harvest Green Industrial Park was developed by Harvest Land Development Sdn Bhd, as part of the larger Sime Darby Business Park.

View project details
By continuing, you agree to the Terms & Privacy Policy
FAQs
The monthly rental in Taman Pasir Putih, Pasir Gudang is RM 11,000 /mo.
No.
Jalan Pasir Putih, Taman Pasir Putih, Pasir Gudang, Johor.
Here is a guide to rent a property in Malaysia including security deposit and understanding the importance of tenancy agreement.
The completion date is in 2017.
By continuing, you agree to the Terms & Privacy Policy