Harvest Green Industrial Park
Jalan Pasir Putih, Taman Pasir Putih, Pasir Gudang, Johor
RM 12,000 /mo
4
Baths
7,441
sqft (floor)
Ready to move in Cluster Factory

Photos

Map View
About this property
Harvest Green Industrial Park Pasir Gudang Cluster factory for rent
Harvest Green Industrial Park, Pasir Gudang
2 units available!
Property Type: Single Storey Cluster Factory with 2-Storey Office
Land Area: 9,161 sq ft
Built-up Area: 7,441 sq ft
Ceiling Heigh: 9m
Power Supply: 150 amp
Gated and Guarded
Rental: RM12,000 per unit/month
Remarks:
• Total of 2 adjoining units available for rent
• Suitable for warehouse, manufacturing, logistics & industrial operations
Common facilities
Parking
Harvest Green Industrial Park

Harvest Green Industrial Park is an innovative and secure industrial park located within the Sime Darby Business Park in Pasir Gudang, Johor. Developed by Harvest Land Development Sdn Bhd on 23.6 acres of freehold land, this development is designed for modern industrial needs, focusing on logistics, manufacturing, and business operations. It is the only gated and guarded freehold industrial park in Pasir Gudang, offering a secure environment with 24-hour CCTV monitoring. Perfectly positioned within Iskandar Malaysia's Flagship D (Eastern Gate Development), Harvest Green offers exceptional connectivity for businesses. The park provides direct access to four major highways: the Pasir Gudang Highway, Senai-Desaru Highway, Coastal Highway, and North-South Highway. Its strategic location places it between two major international ports, with Johor Port and Tanjung Langsat Port accessible within a 10-minute drive. This prime location is ideal for key economic activities such as heavy industries, logistics, electronics, chemical, and food-based industries. Harvest Green Industrial Park features a comprehensive range of Ready Built Facilities (RBF) to ensure businesses can operate immediately and efficiently. The park is equipped with world-class infrastructure, including: A dependable and ample electricity supply is sourced from two separate power plants, the Sultan Iskandar Power Station and YTL Pasir Gudang Power Station. Power capacity ranges from 150 to 200 Amps with a 3-phase supply. Natural gas supply is available on-site via dedicated lines from Gas Malaysia. The park is ready with high-speed broadband to meet modern business demands. It is a fully gated and guarded environment with 24-hour security and CCTV surveillance. Harvest Green offers a variety of factory types to suit different business requirements, all featuring a contemporary design with a 9-meter factory ceiling height. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. Single-storey factories with a two-storey office. The industrial park is surrounded by mature neighborhoods, providing a ready pool of skilled workforce. It is also located near several recreational spots and healthcare facilities, including Tanjung Puteri Golf Resort and Daiman 18 Golf Club. Harvest Green Industrial Park was developed by Harvest Land Development Sdn Bhd, as part of the larger Sime Darby Business Park.
View project details













