The Maple Residences

Jalan Hujan Rintik, Taman Overseas Union (Taman Oug), Jalan Klang Lama (Old Klang Road), Kuala Lumpur

RM 4,100 /mo


Beds

3

Beds

Baths

3

Baths

sqft

1,152

sqft


LRT

700 m (8 mins) from Sri Petaling

loading-bay-o

Ready to move in Condominium


photo

Photos

video

Video

map

Map View

Property details

home-open-o
Condominium for rent
furnished-o
Fully furnished
document-with-lines-o
Completed in Apr 2025
calendar-time-o
Listed on 15 Oct 2026
document-with-lines-o
Listing ID - 502269060
ruler-o
1,152 sqft floor area

About this property

Modern Corner Unit at The Maple Residences

- Spacious 1152 sqft corner lot unit available for immediate rent at RM4,100.
- Fully furnished residence featuring a practical layout with three bedrooms and three bathrooms.
- High quality appliances included such as a fridge, washing machine, dryer, and induction cooker.
- Exclusive amenities including an infinity pool, private garden, and EV car charging station.
- Enhanced safety features provided with a smoke alarm, child safety gate, and 24-hour security.
- Prime location offering seamless connectivity to major highways including the KESAS and NPE.
- Situated within proximity to esteemed educational institutions including SJK and SMK schools.
- Enjoy a refined living experience in a freehold development designed for comfort and accessibility.
Amenities
aircon-o

Air conditioner

bed-o

Bed

asterisk-o

Blinds

asterisk-o

Ceiling fan

Common facilities
security-access-control-o

24-hour security

bbq-o

Bbq

private-garden-o

Community garden

garage-o

Covered linkways

The Maple Residences

Project Image

The Maple Residences

View project details

FAQs

The monthly rental in Taman Overseas Union (Taman Oug), Jalan Klang Lama (Old Klang Road) is RM 4,100 /mo.
Yes (24-hour security).
Jalan Hujan Rintik, Taman Overseas Union (Taman Oug), Jalan Klang Lama (Old Klang Road), Kuala Lumpur.
Here is a guide to rent a property in Malaysia including security deposit and understanding the importance of tenancy agreement.
The completion date is in Apr 2025.