Nilai

Nilai, Negeri Sembilan

RM 85,000,000


Baths

9

Baths

sqft (floor)

211,259

sqft (floor)

auto-size-o

RM 402

psf (floor)


photo

Photos

map

Map View

Property details

home-open-o
Detached Factory for sale
renovated-o
Partially fitted
document-with-lines-o
Completed in 2022
calendar-days-o
Freehold tenure
calendar-time-o
Listed on 17 Mar 2026
document-with-lines-o
Listing ID - 500918616

About this property

Single Store Detached Factory In Nilai (Beside main road)

Location: nilai, pusat bandar nilai, negeri sembilan
- 3 minites away from Nilai PLUS Highway Toll Exit.
- surrounding by factory
- worker accommodation is easily available
- matured industrial amenities with gas pipeline, tnb substation and other industrial facilities.

property details;
- Land size: 7.77 acre or 338, 461 sqft
- built up: 211,259 sqft
- power: 1200 amp (3 phase)
- Industrial status
- Ceiling Height: 12m or 40ft high
- Floor Loading: 10kn/m2
- Selling Price: RM 85,000,000.00(nego)
- monthly rental RM 315,000.00(if tenancy period above 10 years)

Advantages:
- big electrice power available
- big extra land. where by the truck vehicle is able to maneuver.
- available canteen and office
- located in front of main road. Perfect exposure for your business
- located nearby to Nilai Toll Exit (Plus Highway Exit)
- Gas pipeline available
- the building come with certificate of fitness. and it is comply with bomba requirement
- highly suitable for warehousing activities and logistic business and even manufacturing activities with high power consumption

If interested, please contact vincent tan at 0***** for viewing
Estimated mortgage
Mortgage breakdown
Est. monthly repayment
RM 0 / mo
0%
0%
RM 0 Principal
RM 0 Interest
Upfront costs
Total downpayment
RM 0
0%
0%
Downpayment
RM 0 Loan amount at 0% Loan-to-value

RM
RM
%
Yrs
By continuing, you agree to the Terms & Privacy Policy
FAQs
The unit for sale in Nilai, Negeri Sembilan is RM 85,000,000.
No.
Nilai, Negeri Sembilan.
The estimated loan repayment amount is RM 365,222 / mo.
The completion date is in 2022.
By continuing, you agree to the Terms & Privacy Policy