K Avenue

Jalan Cyber City, Kota Kinabalu, Sabah

RM 1,500 /mo

View to Offer

amenity-icon

Studio

Bath

1

Bath

sqft (floor)

350

sqft (floor)


loading-bay-o

Ready to move in Service Residence


photo

Photos

map

Map View

Property details

home-open-o
Service Residence for rent
furnished-o
Fully furnished
document-with-lines-o
Completed in Nov 2022
asterisk-o
Flexible lease
calendar-time-o
Listed on 7 Jan 2026
document-with-lines-o
Listing ID - 500569562

About this property

K Avenue Studio Fully Furnished

K Avenue | Studio Fully Furnished | Facing Pool

K AVENUE | Fully Furnished | Move-In Ready

Block B | High Floor Studio | Pool View

Studio Unit
16th Floor
Fully Furnished Unit
Queen-size bed
Air-conditioning
Dining table & chairs
Built-in kitchen cabinet with sink
2-door refrigerator (NEW)
Bathroom with water heater
1 Ceiling fan


Rental: RM1,500 / month


Term & Condition
1 Year Contract
1 Month Advance Rental
2 Months Security Deposit
Half Month Utility Deposit
Tenancy Agreement + Stamping

Interested? Contact now for Photo & Video
Gavin | 0*****
WhatsApp: www.h*****
Amenities
aircon-o

Air conditioner

light-bulb-simple-o

Basic lights

bed-o

Bed

asterisk-o

Fridge

Common facilities
parking-o

Covered car park

taxi-o

Drop off point

gym-o

Gym

jacuzzi-o

Jacuzzi

K Avenue

Project Image

K Avenue is located at a mature location which surrounded by shoplot and residential apartments, as the government has restricted residential unit to operate for AIRBNB. K avenue is providing travelers peaceful mind to stay in a studio, dual key or triple key unit which just 5 mins away from KKIA, and connected with 3 major highway & 6-lane roads to KK City. Besides that, it is just few minutes driving to ITCC shopping and other interesting places.

View project details
FAQs
The monthly rental in Kota Kinabalu, Sabah is RM 1,500 /mo.
No.
Jalan Cyber City, Kota Kinabalu, Sabah.
Here is a guide to rent a property in Malaysia including security deposit and understanding the importance of tenancy agreement.
The completion date is in Nov 2022.