Renovating a house is more than just giving walls a fresh coat of paint. It’s a transformative process, one that can improve comfort, increase property value, optimise space, and reflect your personal style.
But for many Malaysian homeowners, renovating comes with uncertainty: How much will it cost in 2026? What permits are required? Which design trends matter? And how do you avoid common pitfalls?
In this guide, we walk you through everything you need to know to renovate a home in Malaysia in 2026, from budgeting and regulatory compliance to renovation ideas and trend forecasting. We’ll also highlight real Malaysian renovation case studies for inspiration as you plan your own makeover.
Search Rentals Across Malaysia
Compare Options That Suit Your Budget
Why Renovate in 2026? Key Drivers & Trends
To make informed renovation decisions this year, it’s worth looking at the trends and pressures shaping the latest landscape:
Rising Property Value & Cost of Living
As property prices continue to climb, many homeowners prefer renovating over relocating. It’s often more economical to improve an existing home than to sell and buy again, especially in urban areas where land is scarce.
Inflation and Material Costs
Material costs (tiles, timber, fittings) have remained elevated. Skilled labour remains in high demand, particularly for certified contractors. Renovating in 2026 means factoring in these higher base costs, as well as broader availability of sustainable materials.
New Regulatory Emphasis
Local councils are tightening oversight of renovation works. Under the One-Stop Centre (OSC) system, most renovation proposals now need formal approval. For example, Kuala Lumpur City Hall (DBKL) requires renovation plans to be completed within 1 year of approval, or they must be renewed up to 3 times, each with a fee of RM 100.
This is non-trivial: failing to secure permits or ignoring regulations can lead to heavy fines or even forced demolition.
Sustainability & Green Living
2026 sees a stronger push towards eco-friendly designs: low-flow water fixtures, energy-efficient lighting, solar-ready wiring, cross-ventilation, and biophilic elements are now standard in renovation plans. These features not only reduce utility bills but also make long-term homes more desirable.
Taken together, these factors make it clear that renovating in 2026 is as much about strategy as it is about design.
Renovation Permits and Compliance: What You Must Know
Before beginning any renovation work, it’s crucial to understand the permits, approvals, and compliance rules that govern what you can and cannot do:
When Permits Are Required?
Under Malaysian law (Street, Drainage, and Buildings Act 1974), significant alterations require written approval from the local authority.
These include:
- Partition walls or remove walls
- Adding a loft, mezzanine, or new roof structure
- Extensions (e.g., balcony or second-floor addition)
- Changes in building use or facade
Common Permits and Approvals
Before any work begins, it’s essential to secure the proper paperwork. These are the approvals most homeowners must consider when renovating in Malaysia:
- Minor Construction Work Permit: Required for renovation work such as tiling, adding fences or awnings.
- Architect/Engineer Plans: For structural changes, you’ll need drawings and, if required, an engineer’s sign-off.
- Strata Approvals: If renovating a condominium, you also need consent from the building’s Management Corporation (MC).
- OSC (One-Stop Centre): Many local councils now operate digital submission systems for renovation plans. RumahHQ
Time Limits and Legal Risks
Even with approvals in hand, compliance doesn’t end there; homeowners must stay aware of validity periods and enforcement rules:
- DBKL (KL) imposes a one-year validity for renovation approvals. Projects not completed within this time may need renewal.
- Permits issued for work that fails to comply with approved plans can lead to fines or, worse, demolition orders.
- Reputable contractors must register with the authorities; they should also provide signed contracts, detailed plans, and a valid proof of approval.
A clear grasp of these requirements not only protects you legally but ensures your renovation proceeds smoothly, safely, and without costly setbacks.
Renovation Budgeting: Realistic Costs for 2026
Knowing the financial landscape helps make renovation less stressful and more streamlined:
Cost Range by Property Type
Per current data:
- Condominiums/Apartments: RM 40,000 – RM 150,000+ for complete makeovers.
- Terrace Houses: RM 50,000 – RM 150,000 for a complete renovation.
- Semi-Detached/Bungalow Homes: Projects typically start around RM 100,000, scaling to RM 500,000+ for luxury and structural works.
Cost per Square Foot
One reliable rule of thumb: renovation costs now average from RM20 to RM150+ per square foot, depending on the scale and quality.
For mid-range renovations, design guides suggest RM 120-RM 200/sq ft.
Itemised Renovation Costs
According to iDFAC Engineering, here are the typical 2026 price brackets:
| Item | Cost Estimate |
| Hacking/Demolition | RM 2,000 – RM 3,000 per area |
| Rebuilding Walls | RM 50 – RM 80 per sq ft |
| Waterproofing/Bathroom Wet Works | RM 1,500 – RM 2,000 per bathroom |
| Tiles | RM 11 – RM 15 per sq ft (ceramic/porcelain) |
| Electrical Points | RM 65 – RM 90 per point |
| 13A Power Sockets | RM 100 – RM 150 per point |
| Full Rewiring | RM 3,500 – RM 10,000+ (entire project) |
| New Piping | RM 350 – RM 550 per plumbing point |
| Kitchen Cabinets (Melamine) | RM 200 – RM 450 per foot run |
| Plaster Ceiling | RM 5 – RM 7 per sq ft |
Room-by-Room Cost Breakdown
Based on recent renovation companies:
- Kitchen: RM 10,000 – RM 100,000, depending on size and finish.
- Bathroom: RM 5,000 – RM 50,000, depending on fixtures and level of wet work.
- Living/Bedrooms: RM 10,000 – RM 70,000; built-ins and bespoke carpentry can push this up.
- Exterior & Landscaping: RM 10,000 – RM 100,000+, depending on scope/outdoor design.
Contingency Fund
Always set aside 10-20% of your total renovation budget for unexpected costs.
This buffer helps cover unforeseen issues, such as structural surprises, labour delays, or changes in material costs.
Altogether, a realistic grasp of 2026 renovation costs allows you to plan with confidence, avoid budget shocks, and bring your project to life without unnecessary financial strain.
Plan Your Home Financing Smartly
See Your Monthly Repayments Instantly
What to Do Before You Renovate?

Renovating without proper planning is risky. Here’s a checklist to set you up for your renovating goals:
Define Your Scope Clearly
- Decide whether you want a light refresh (painting, minor carpentry) or a complete renovation (structural changes, layout rework).
- Prepare rough floor plans, photos, and reference ideas for contractors or designers.
Hire Wisely
- Insist on CIDB-registered contractors or certified interior designers.
- Ask to see a portfolio of similar work and speak to past clients.
- Negotiate a written contract that includes: scope, timeline, payment schedule, and penalty for delays.
Budget Smart
- Use the cost benchmarks above to create a realistic budget.
- Include professional fees (architect, engineer), permits, and contingency.
- Ask for fixed-cost proposals where possible (to avoid "surprises").
Submit Plans for Approval
- Prepare documentation for local council/OSC application.
- Submit renovation plans early; permit turnaround times vary (especially for structural work).
- For strata (condos), obtain necessary management corporation approvals.
Plan for Disruption
- Expect noise, dust, and temporary relocation (if needed).
- Allow time for council approvals and possible plan revisions.
- Set interim milestones (demolition, wiring, finish work) with your contractor.
By taking these steps upfront, you lay the groundwork for a smoother renovation journey and significantly reduce the risk of costly surprises later on.
Four Remarkable Malaysian Renovation House Projects
Here are four real-life renovation house projects in Malaysia, each offering a distinct style, design lesson, and budget insight:
1. English Cottage Charm – Asri Meris Anthony
Asri converted a rustic kampung house into a charming English cottage-inspired home. He replaced rotting timber, rebuilt concrete flooring, and introduced a farmhouse-style interior. The transformation reportedly cost nearly RM200,000 across different phases.
This kind of phased renovation is smart; it spreads the financial load and allows for progressive design.
2. Minimalist Simplicity – Mcyah Joanjett
Mcyah refreshed her home with a minimalist makeover: white paint, floating shelves, simple lighting, and potted plants. She emphasises DIY work, sourcing her own materials to save cost.
This project illustrates that a renovation doesn’t have to cost a fortune, especially if you focus on cosmetic improvements and take the time to DIY smartly.
3. Multi-Level Reconfiguration – Eleena Jamil Architects
A two-storey terrace house was reimagined into a sleek three-storey home by removing non-load-bearing walls, creating a double-height living area, and adding a rooftop terrace mapped with greenery. The redesign prioritised airflow and natural light.
This level of architectural intervention typically falls into the higher renovation brackets (structural work, engineering, and permit fees).
4. Shared Living Innovation – Tetawowe Atelier
Facing high housing costs, this narrow terrace was split into two vertical units. With a slim staircase, airy design, and a mezzanine "floating garden", the project manages to be both communal and private.
This model is a strong demonstration of adaptive space planning and shows how a renovated house can address modern urban living challenges.
Together, these projects show how thoughtful design, smart budgeting, and creative space planning can turn any Malaysian home into something truly remarkable.
Common Pitfalls & How to Avoid Them?
Even the best plans can go awry without care. Here are common renovation risks and how to mitigate them:
a) Under-estimating Costs
Many homeowners forget to budget for structural inspections, engineering reports, or permit fees. Always add a 10-20% contingency.
Many homeowners forget to budget for structural inspections, engineering reports, or permit fees. Always add a 10-20% contingency.
b) Hiring the Wrong Contractor
A poorly vetted contractor can cost you more in the long run, through shoddy work or missed deadlines. Insist on references, check their portfolio, and confirm their legitimacy.
A poorly vetted contractor can cost you more in the long run, through shoddy work or missed deadlines. Insist on references, check their portfolio, and confirm their legitimacy.
c) Skipping Permits
Renovating without a permit is risky; legal action, fines, or even demolition can follow. Under the law, work such as structural changes and partitions often requires formal approval.
Renovating without a permit is risky; legal action, fines, or even demolition can follow. Under the law, work such as structural changes and partitions often requires formal approval.
Also, local councils like DBKL impose a one-year validity on renovation plans; planning your timeline is vital.
d) Ignoring Sustainability
Homeowners regret skipping green upgrades. Incorporating water- and energy-efficient systems from the outset reduces long-term energy and water bills and improves your home’s value.
Homeowners regret skipping green upgrades. Incorporating water- and energy-efficient systems from the outset reduces long-term energy and water bills and improves your home’s value.
e) Not Planning for Resale
If you intend to sell in the future, make renovation decisions that appeal to a broad range of buyers (neutral finishes, good lighting, durable materials). Avoid overly trendy details unless you plan to stay long-term.
If you intend to sell in the future, make renovation decisions that appeal to a broad range of buyers (neutral finishes, good lighting, durable materials). Avoid overly trendy details unless you plan to stay long-term.
With a bit of foresight and the proper checks in place, you can sidestep these pitfalls and carry out a renovation that feels smooth, secure, and genuinely worthwhile.
Financing Your Renovation House in Malaysia
Before diving into design or demolition, it’s worth understanding the financing routes available to support your renovation plans:
Renovation Loans & Financing Options

Practical Tips

With the right financing strategy in place, you’ll be able to renovate confidently and keep your project on steady financial ground.
Some latest trends You Should Know for 2026
If you’re renovating now, these design trends are especially relevant:
- Multi-Functional Rooms: Home offices, hybrid living-dining rooms, and foldable partitions are in.
- Sustainable Materials: Bamboo flooring, recycled tiles, and low-VOC paints see strong growth.
- Smart & Energy-Efficient Homes: Solar-ready wiring, bright LED lighting, and energy-efficient appliances are increasingly common.
- Natural Ventilation & Daylighting: Ceiling height optimisation, large windows, and double-volume spaces enhance airflow and light.
- Minimalist Biophilic Design: Clean lines + indoor plants = harmony + reduced renovation clutter.
Together, these trends reflect how Malaysian homes in 2026 are shifting toward more innovative, greener, and more adaptable living spaces.
Sample Renovation Timeline
Here’s a rough timeline for a whole-home renovation project (terraced or landed):
Planning & Permits
6-10 weeks
Hire an architect/engineer, submit OSC application, receive approval
Demolition & Structural Work
2-4 weeks
Wall hacking, structural modifications, rebar, slab works
M&E (Mechanical + Electrical)
2-4 weeks (overlaps)
Rewiring, plumbing install, and new switch points
Carpentry & Cabinets
3-5 weeks
Cabinets, wardrobes, built-ins, ceiling work
Tiling, Flooring & Painting
3-6 weeks
Floor tiles, wall paint, and ceiling finishing
Fixtures & Fittings
1-3 weeks
Install lights, bathroom fittings, and kitchen appliances
Final Touches & Handover
1-2 weeks
Clean-up, snagging, punch-list corrections
Reminder: DBKL requires most renovation work to be completed within a year of approval.
Altogether, this timeline offers a practical framework to help you plan, manage expectations, and keep your renovation moving smoothly from approval to handover.
Crucial Considerations for Malaysian Homes in 2026
Renovating a house in 2026 is far more than just aesthetics; it’s a serious investment. With rising costs, regulatory scrutiny, and evolving design trends, planning is more crucial than ever.
Here’s what to prioritise:
- Validate your renovation budget with accurate, up-to-date cost benchmarks.
- Secure the proper permits before work begins to avoid fines or worse.
- Hire reliable professionals: designers, contractors, and engineers, and insist on contracts and plans.
- Sustainability plan: energy-efficient appliances and green work not only reduce bills but also pay off in resale value.
- Build in a buffer: allocate at least 10-20% of your budget for surprises.
- Think long-term: Make renovation choices that improve everyday living, not just Instagram aesthetics.
Explore the latest listings on PropertyGuru Malaysia to find your ideal home, then connect with trusted contractors and interior designers who can bring your vision to life, smartly, safely, and stylishly.
Disclaimer: The information is provided for general information only. PropertyGuru International (Malaysia) Sdn Bhd makes no representations or warranties in relation to the information, including but not limited to any representation or warranty as to the fitness for any particular purpose of the information to the fullest extent permitted by law. While every effort has been made to ensure that the information provided in this article is accurate, reliable, and complete as of the time of writing, the information provided in this article should not be relied upon to make any financial, investment, real estate or legal decisions. Additionally, the information should not substitute advice from a trained professional who can take into account your personal facts and circumstances, and we accept no liability if you use the information to form decisions.


